FieldDock GIG Operations

Drop Bury Intake

Complete all required job details. The route drawing must show the intended drop path on an aerial/satellite screenshot of the address.

Technician Information

Who is submitting this request?

Must be exactly 4 digits.


Job Information

Basic job and customer information.

Aerial Route Drawing

The technician must screenshot an aerial/satellite view of the address, draw the proposed drop route, and upload it below.

Route Drawing Instructions
  1. Enter the full address above.
  2. Click Open Address in Maps.
  3. Switch to satellite/aerial view if needed.
  4. Screenshot the property view.
  5. Draw the drop route clearly on the screenshot.
  6. Upload the marked screenshot below.

Required. Upload the aerial/satellite screenshot with the drop route drawn on it.

Drop Route Details

Describe the route, footage, bores, and anything that affects bury path.

Utilities / Obstacles in Bury Path

Signal / Install Details

All signal and install detail fields are required.

Customer Acknowledgment

Customer signature confirming the submitted route and notes have been reviewed.

Customer signature is required.

Additional Photos / Notes

Upload any supporting photos that help clarify the job.

Optional. Use this for tap photos, property photos, gate/utility photos, or supporting screenshots.

Cancel